• USD/RUB USD/RUB 82.19
  • EUR/RUB EUR/RUB 90.34
  • CNY/RUB CNY/RUB 12.28
  • Bitcoin Bitcoin BTC $60460
  • Ethereum Ethereum ETH $1687
  • Ripple Ripple XRP $0.93
  • Solana Solana SOL $70.59
  • Cardano Cardano ADA $0.14
  • USD/RUB USD/RUB 82.19
  • EUR/RUB EUR/RUB 90.34
  • CNY/RUB CNY/RUB 12.28
  • Bitcoin Bitcoin BTC $60460
  • Ethereum Ethereum ETH $1687
  • Ripple Ripple XRP $0.93
  • Solana Solana SOL $70.59
  • Cardano Cardano ADA $0.14

Kazakhstan deepens Aktau port: cargo traffic along the Middle Corridor will grow by 30%

Kazakhstan deepens Aktau port: cargo traffic along the Middle Corridor will grow by 30%
Most Popular
20.11
China-Africa Trade Expo opens in Johannesburg
20.11
Unified USN notification form: terms and procedure for submission
20.11
The Ministry of Finance proposes the code 88:88:888888:8888888888 for objects without a cadastral number
20.11
How to compare the Wildberries report and correctly account for income on the USN
20.11
Belarus launches mobile application for electronic queue at the border with the EU
20.11
20.7% discount on containers in gondola cars: Russian Railways offers to refund the tariff
Dredging operations have started in Aktau port in response to the drop in the Caspian Sea level, which restricts navigation. The project will increase the capacity of the Trans-Caspian International Transport Route by 30% and reduce the cost of the offshore section by 10-15%. For shippers working with China through the Middle Corridor, this is a direct improvement in transit conditions.

The contractor, China Harbor Engineering Company Ltd (CHECK), has already conducted geodetic surveys, mobilized dredgers and specialized equipment. Of the planned 785 m of the enclosing dam, 680 m has been built on the alluvial site.

The volume of excavation will amount to about 1.3 million cubic meters. m. The depth of the water area after completion of the work will reach 6-7 m. Now this is not enough for full—fledged operation of the port in the conditions of the ongoing decrease in the level of the Caspian Sea. Dredging will increase the safety of navigation and create the basis for further investments in port infrastructure.

The implementation period is until the end of 2026. After the completion of the project, the cost of the offshore section of the Middle Corridor should decrease by 10-15%.

Aktau Seaport is located on the eastern coast of the Caspian Sea and is part of the Caspian Transport and Logistics hub. Corridors connecting Kazakhstan with Iran, Azerbaijan, Russia and Turkey pass through it. The port processes dry cargo, crude oil and petroleum products: in the first eight months of 2026, KazTransOil increased oil transshipment through Aktau by 6% to 2.38 million tons.

TMTM is experiencing steady growth. The volume of container traffic between China and Europe along the route increased by 30% in the first five months of 2026. Kazakhstan intends to increase the total capacity of the corridor from 6 million to 10 million tons by 2028, and the capacity of the country's seaports to 30 million tons by 2030.

For Russian and European importers who are building supply chains through China bypassing traditional routes, Aktau's expansion is changing the calculation: a deeper water area will allow for the use of larger vessels, and lower freight rates on the offshore shoulder will make the route more competitive relative to northern alternatives. The first container train of the new container hub has already been handled at the port — the infrastructure is being built up in parallel with dredging.

Our Deliver2 group in VK
A group about foreign trade news: current routes, up-to-date payment methods, market participants opinions, interviews and podcasts.

Related materials: